Rental anti-piracy barriers · Glasgow, UK+44 (0) 131 564 0256[email protected]We reply within one working day
Book a 3-month trial
Crew fitting a Palaemon barrier set to the guard rail
How it works

Engineered protection, designed for fleet operations

From vessel assessment to the next transit, Palaemon barriers follow one structured process built for high-risk waters.

  • Delivered globally
  • Installed by crew
  • No specialist support
  • Stows flat on board
The system

Two panels, four straps, one metre of rail

Each barrier set covers one metre of guard rail. The bottom panel straps to the ship's railing. The top panel, the overhang, is what stops attackers attaching a ladder or hook.

Bottom panelStatic load test up to 500 kg with no deformation or signs of breakage.
Lashing strapsCertified to 800 kg breaking strain.
Straps per set4 — 2 × 4 m straps attach the bottom panel to the ship's railing; 2 × 2 m straps secure the top panel to the bottom panel.
A Palaemon barrier set: the bottom panel, which straps to the rail, and the overhanging top panel
The Palaemon operational process

Four steps, built around your schedule

1

Assessment

We review the vessel's general arrangement drawings and operational requirements to set the barrier configuration and deployment plan.

2

Delivery

Barriers are delivered globally, to port or offshore, in line with your vessel schedule.

3

Deployment

The crew fits them with simple tools and our guidance. They stay rigged through the high-risk transit without disrupting operations.

4

Between transits

Barriers stay rigged on the guard rail or stow flat on board until the next transit. When your programme ends, we recover them at port or offshore for inspection and redeployment.

Pallets of Palaemon barriers on a launch, heading out from port to a vessel
Barrier pallets being craned aboard a container ship
Barriers rigged on a Maersk container ship, port side
Designed to be installed by the crew

Less than a minute per metre

Steve Regis, our founder, is a former Royal Marines Commando who sailed on more than 50 ships through high-risk areas. He built Palaemon to replace razor wire with something engineered for the job and practical for the crew.

The bottom panel straps to the guard rail with ratchet straps; the top panel stops a ladder from finding purchase. It is lightweight, robust and quick to fit.

Between transits

Stows flat, ready to go

Most operators keep it on board, rigged or stowed flat, ready for the next transit. Prefer it ashore? We can store it for you, though repeated port deliveries usually add more cost and admin than they save.

  • Rigged on the rail. Once fitted, barriers can stay in position through port calls, cargo operations and STS.
  • Stowed flat on board. The panels nest flat. One pallet, 1000 × 1300 mm (1.3 m² of deck), holds 12 sets as a mixed pallet of top and bottom panels.
  • Where to stow. Lash pallets clear of walkways, rails and mooring areas: a deck store, the poop deck, the forecastle, or on a bulk carrier the gaps between hatch coamings.
  • Stored ashore, if you prefer. Available on request. Shore storage is available at our regional hubs, and for enterprise fleets we can quickly set up a custom hub in the location you prefer.

Example: a 200 m ship protected from the stern to the manifold on both sides needs 200 sets, plus 30 across the stern: 230 sets, which is 20 pallets, or about 26 m² of deck.

Barrier panels stacked flat on pallets
Top panel nested on bottom panels for flat stowage
Barrier panels lashed upright in a deck store
Barriers left rigged across the stern
Our global logistics network

Aligned with your operations

Strategic hubs outside the high-risk areas. Delivery at berth or at sea via OPL, short-notice capability and flexible recovery. Mobilisation takes up to 72 hours.

Routes run from each hub to the high-risk waters it serves. Risk zones glow by reported activity over the last 90 days, from our piracy heat map.

7hubs with a permanent presence
3high-risk regions: Gulf of Aden, West Africa, SE Asia
150+vessels across global commercial fleets
Up to 72hmobilisation
Supply & returns hub

Rotterdam

Major supply and returns hub serving vessels in the ARA area and mainland Europe, at berth or via OPL. Road freight across mainland Europe.

Supply & returns hub

Las Palmas

Major supply and returns hub, at berth or via OPL. The natural staging point for West Africa and Gulf of Guinea calls.

Supply hub

Morocco

Supply hub for vessels on Atlantic and Mediterranean routes.

Production, supply & returns hub

Cape Town

Production location and major hub, serving South African ports including Durban and Port Elizabeth.

Supply & returns hub

UAE

Supply and returns in all Emirati ports at berth or via OPL, with delivery and returns in Oman.

Supply & returns hub

Singapore

Major supply and returns centre, at berth or via OPL, for the Singapore Strait and South East Asia.

Production & supply hub

China

Production location supplying ports across China, with delivery options supporting South Korea.

The locations listed have a permanent presence. We can deliver to and take returns at most major ports and countries worldwide.

Proven in operations

On every major vessel type

LNG carrier icon

LNG carriers

Tanker icon

Tankers

Container ship icon

Container ships

Offshore support vessel icon

Offshore support

Try it on one ship for three months

We size the barriers, deliver them and brief your crew. You judge it in service.

Book a trialSize barriers